RIBA Stages Explained: The Complete Roadmap for Home Projects
Impossible d'ajouter des articles
Échec de l’élimination de la liste d'envies.
Impossible de suivre le podcast
Impossible de ne plus suivre le podcast
-
Lu par :
-
De :
À propos de ce contenu audio
How do you avoid costly delays on a build?
Planning permission approved is just the beginning, not the green light to start building.
We break down the eight RIBA stages that structure every successful residential project, from initial feasibility through to post-occupancy evaluation.
Through our combined experience as architect and quantity surveyor, we explain why spending time on technical design prevents six-figure cost overruns during construction. We share the critical tender stage that RIBA overlooks and why rushing to site after planning approval is one of the most expensive mistakes homeowners make.
This episode walks through what you should expect at each stage, which consultants to involve when, and how proper staging controls both risk and budget evolution.
Get this framework wrong and you'll lose money during construction. Get it right and your build becomes manageable, predictable, and even enjoyable.
“It’s about removal of stress through a build” – Tina Patel
You’ll hear about:
- What RIBA stages mean
- Feasibility versus concept design differences
- When to involve planning consultants
- Technical design and its critical importance
- The missing tender stage
- Construction phase mini stages
- Strip out before main contract starts
- Contractor familiarisation and procurement structure
- Handover certification and legal requirements
- Post-occupancy evaluation benefits
- Cost planning through each stage
Connect with us:
Tima Patel - https://www.linkedin.com/in/tinapatel/
Bart Kolosowski - https://www.linkedin.com/in/bartkolosowski/
Produced by Between Tracks - https://www.betweentracks.com/
Vous êtes membre Amazon Prime ?
Bénéficiez automatiquement de 2 livres audio offerts.Bonne écoute !