#431 - Check It Twice: How to Eliminate RFIs and Engineering Failures
Impossible d'ajouter des articles
Échec de l’élimination de la liste d'envies.
Impossible de suivre le podcast
Impossible de ne plus suivre le podcast
-
Lu par :
-
De :
In this episode of the Construction Corner podcast, host Dillon breaks down the most common failure points in the traditional plan-and-spec process and explains why some projects end up buried in RFIs. He pulls back the curtain on the two sides of the RFI problem — engineering teams that don't allocate enough time or resources, and owners who haven't fully defined what they want before design begins. Dillon walks through how placeholder strategies can keep projects moving even when final details are unknown, and explains why some project types (like custom manufacturing facilities) will naturally generate more RFIs than cookie-cutter builds like chain restaurants or standard hotel rooms. His bottom line: most RFI problems come down to not having a solid checklist and not working through it methodically — so make your list, and check it twice.