Épisodes

  • EXPECT DIFFERENT: Better use of digital tools
    Oct 10 2025

    Dale Sinclair in discussion with Eva Magnisali, founder and CEO of DataForm Lab, about making better use of digital tools from the manufacturers' perspective.

    Afficher plus Afficher moins
    19 min
  • EXPECT DIFFERENT: Robotics
    Oct 10 2025

    Dale Sinclair talks to Az Jasat, Senior Industry Manager, Industrialized Construction at Autodesk, and Sebastian Andraos, Co-founder and CEO of HAL Robotics, on making robotics usage more widespread in the AEC industry.

    Afficher plus Afficher moins
    28 min
  • EXPECT DIFFERENT: Mobilizing Kit of Parts
    Oct 10 2025

    Johnathan Munkley speaks with David Miller, Director & Principal Architect at DMA, and Mark Thorley, Co Founder & CEO of KOPE, about what it will take to mobilize kit-of-parts at scale.

    Afficher plus Afficher moins
    27 min
  • EXPECT DIFFERENT: Construction materials for longevity and sustainability
    Oct 10 2025

    Dale Sinclair in discussion with Peter Fisher, Director at Bennetts Associates, about construction materials and designing buildings with a focus on longevity and sustainability.

    Afficher plus Afficher moins
    18 min
  • EXPECT DIFFERENT: Normalizing MMC
    Oct 10 2025

    Johnathan Munkley talks with Paul Drayton, Head of Digital Europe at Laing O'Rourke, and Claire Callan, Technical Director - Smart Places at WSP, about making modern methods of construction and offsite the norm in the AEC industry.

    Afficher plus Afficher moins
    27 min
  • EXPECT DIFFERENT: Shifting from construction to manufacturing
    Oct 10 2025

    Dale Sinclair talks with Bruce Bell, Founder & CEO of Facit, and Tim Hall, Consultant from Total Flow, about the shift towards a manufacturing-based approach to construction.

    Afficher plus Afficher moins
    29 min
  • EXPECT DIFFERENT: Designing for manufacturing and assembly
    Oct 10 2025

    Dale Sinclair speaks with Dan Pollard, Production Director at Thurston Group, about shifting from designing for construction to designing for manufacturing and assembly.

    Afficher plus Afficher moins
    17 min