Cover of The Site Book: Site Safety in Five

The Site Book: Site Safety in Five

The Site Book: Site Safety in Five

By: The Site Book
Listen for free

Season's Savings | 0.99 €/month for 3 months

5.99 €/month thereafter - terms apply. Cancel monthly.
Summary
Short, practical audio summaries of The Site Book's UK construction compliance guides — RAMS, CDM 2015, site paperwork and safety duties.© 2026 The Site Book
Episodes
  • Can a fitter use a bump cap instead of a hard hat in a service cupboard?
    24 Nov 2026

    A fitter crouched under a low pipe might reach for a bump cap, but the walk in and out passes under other trades' overhead work. This episode works through when a bump cap is suitable, when a helmet is needed, and what the firm running the site decides and checks before anyone swaps their head protection.

    Bump caps protect against knocking your head on a fixed object, not falling tools or fittings.

    Where things could fall onto someone, a suitable safety helmet is needed.

    HSE says a risk of head injury remains on almost all construction sites after other controls.

    Check the whole journey in and out, not just the workface, and reassess when overhead work changes.

    Set a site rule that names the location and action, and put it in the induction.

    Read the full guide on The Site Book: https://thesitebook.co.uk/blog/bump-cap-instead-of-hard-hat-on-site

    Show more Show less
    3 min
  • How long is a site induction valid, and how long should you keep the records?
    24 Nov 2026

    A single-voice answer for the firm running the site: a site induction counts for one site and one set of risks, so you induct again on every new job and re-brief when things change. It also covers how long to keep the signed records when no regulation sets a period.

    An induction is valid for one site and one set of risks, not for the worker.

    Re-brief or re-induct when the plan, the risks or a worker's job changes.

    No regulation sets a retention period; our view is the life of the project plus at least three years.

    Keep the site induction register yourself and agree record-keeping at the pre-start meeting.

    Read the full guide on The Site Book: https://thesitebook.co.uk/blog/how-long-is-a-site-induction-valid

    Show more Show less
    4 min
  • When do you need to update a RAMS you've already accepted?
    22 Nov 2026

    A single-voice episode on when an already accepted RAMS needs a new version. It uses a Surrey roof fire reported by HSE, explains that the law turns on change rather than a calendar date, and sets out the order to work through, how to re-brief properly, and what the firm running the site should check.

    The law turns on change, not a calendar date: there is no fixed review interval for a risk assessment.

    Regulation three of the Management regulations puts the review duty on the employer who made the assessment.

    Common triggers: a change to the method, equipment or substances, the people, an accident or near miss, a reported problem, or controls not working.

    The firm whose work it is revises its own RAMS; the firm running the site checks the new version before changed work starts.

    Re-brief the gang on the new version and keep the old version marked superseded.

    Read the full guide on The Site Book: https://thesitebook.co.uk/blog/when-to-update-rams

    Show more Show less
    4 min
adbl_web_anon_alc_button_suppression_t1
No reviews yet