My Doosan Ran Its Last Job - Ep. 183
Unable to add items
Add to basket failed.
Add to wishlist failed.
Failed to remove from Wish List.
Adding to library failed
Unable to follow podcast
Unable to unfollow podcast
-
Narrated by:
-
By:
Join the Discord by subscribing on patreon - https://patreon.com/tapsandpatience Get Parts Made! - https://subtractmanufacturing.com-----In the 183rd episode of Taps and Patience, Harrison says the SVM has run its last job, expects the VF4 to be built this week, and is trying to get it before or after Thanksgiving, the same week Weston has his third kid, while concrete footings start on a 40% shop expansion and Ben takes on a rushed six-inch stainless job. AJ, done with weekday classes, plays courier on a stressful Subtract type II titanium anodizing job, then covers first heat-treat tests, BAM 2.0 CAM he vibe-coded for the Wazer, used Renishaw probes to replace a dying Pioneer system, and a custom Android launcher for Bob. In the Q&A, they advise Trevor on commissioning ball bars and a TRT 210 trunnion, trade shop fluids with Patrick, and warn Max off a Harbor Freight concrete-mixer tumbler.-----Check out the hosts on Instagram:https://instagram.com/audacity_microhttps://instagram.com/precisioningenuity